skip to Main Content
587-525-5855 [email protected]
TwitterFacebookGoogle PlusInstagramFlickrYoutube
PRIMED Mosaic Centre in south Edmonton, Alberta
  • About
    • Documentary
    • How We Did It
      • Unplanned Collaborations
      • Ride and Rinse
      • IPD Process
      • Heating & Cooling Using Mother Earth
      • Knock on Wood
      • Harvesting the Rain
      • Solar Electricity
      • Solar Lease
    • FAQs
  • Vision
    • The Ideal Workplace
    • Vision Statement
    • Inspiration
      • The Bullitt Centre
      • Eco-Sense
      • Germantown Sustainable Urban Science Center
      • Hawaii Preparatory Academy Energy Lab
      • Hagaporten 3
      • SMA Solar Academy
      • The John and Frances Angelos Law Center (University of Baltimore)
      • Omega Center for Sustainable Living (OCSL)
  • Construction
    • IPD Process
      • Beginning Stages
      • Process Overview
      • Early Involvement of Key Participants
      • Shared Risk and Reward Based on Project Outcome
      • Joint Project Control
      • Reduced Liability Exposure
      • Jointly Developed and Validated Targets
    • Engineering & Research
    • Architectural & Site Plan
  • Media
    • Documentary
    • Blog
    • Press Coverage
    • Photo Gallery
  • Contact
  • Search
Open Mobile Menu

The Right People On the Project Bus

  • February 3, 2014
  • Dennis Cuku
  • Process, The Team
Why getting the right team in place is critical at the beginning of a project...
Read More→

Once Upon a Time

  • November 4, 2013
  • Vedran Skopac, Architect, Manasc Isaac
  • Design, The Building
Once upon a time...
Read More→

Trades and IPD? Excitement and Trepidation

  • September 24, 2013
  • Jennifer Hancock, Special Projects, Chandos
  • Design, Process, The Building, The Team
Preliminary meetings show both excitement and fear respecting the IPD approach.
Read More→

Interviews With the Team: A Lot of Work, But Well Worth the Trouble

  • September 24, 2013
  • Jennifer Hancock, Special Projects, Chandos
  • Process, The Building, The Team
Interviews with staff help build a culture of openness and raise self-awareness among the team.
Read More→

Project Budget: The Fight Between Dreams and Limitations

  • September 5, 2013
  • Stephan Pasche, Structural Engineer, Fast + Epp
  • Design, Process, The Building
The challenge of design: striking the balance between dreams and limitations.
Read More→

Every Building Has an Owner

  • September 5, 2013
  • Stephan Pasche, Structural Engineer, Fast + Epp
  • Design, The Team
A different approach to the engineer-owner relationship.
Read More→

The Word is Out… Permit Drawings First Glance

  • July 18, 2013
  • Dennis Cuku
  • Design, Planning, The Building
All systems go! (and other related steaming pant-loads of awesomeness)
Read More→

Costing Crisis

  • June 26, 2013
  • Shafraaz Kaba, Architect, Manasc Isaac Architects
  • Challenges, Construction, Educate Me, Planning
The numbers don’t lie. But sometimes they’re not right either.
Read More→

Concept Workshop – Take Two

  • June 14, 2013
  • Shafraaz Kaba, Architect, Manasc Isaac Architects
  • Challenges, Planning
Steering through chaos (and right through lunch)
Read More→

Putting the Petal to the Metal and Getting Back in the Box

  • June 14, 2013
  • Stephani Carter, LEED AP, EcoAmmo
  • Construction, Design, Educate Me, Inspiration, Planning, Process
Well, the lovely petal building has been squashed by budget and energy goals. We are left with a simple box, like what I started with back in April. Aesthetically I’m sad, but at the same time, it’s a good move in respect to reaching our project goals.
Read More→
  • Previous
  • Page 1
  • …
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Next
Recent Posts
  • Mosaic InterChange Bids Farewell
  • Mosaic Centre Case Study by the Canadian Wood Council
  • Video Flyover of Mosaic Centre Building Exterior
  • Interview with CBC Edmonton
  • Celebrate Solstice with us on June 20
Topics
  • Challenges
  • Construction
  • Design
  • Educate Me
  • Inspiration
  • Integrated Project Delivery (IPD)
  • Planning
  • Press Coverage
  • Process
  • The Building
  • The Team
  • Uncategorized
Watch the documentary video series about our incredible journey to build Alberta's first net-zero, LEED Platinum commercial building.
Watch Now
Contact the priMED Mosaic Centre

2003 91 Street SW
Edmonton, Alberta T6X 0W8
Canada

587 525 5855
info@primedmosaiccentre.com
Map to priMED Mosaic Centre
Photostream
Search this site
 
Back To Top