Maximizing Output: What’s Your End Goal?

The past 5 years have seen a significant drop in the cost of solar PV modules. A module that cost $2.50/watt in 2009 is now available for under $1/watt. This has significantly changed the way in which solar systems are now engineered. It’s no longer about maximizing the individual module; it’s about maximizing the total amount of energy your roof can produce, even at the expense of less output per module.
Read More

Digging Deeper with a Budget

The role of an estimator is not an easy one, especially in the conceptual design stage. Traditionally, the design is near-complete and specifications are already set by the time the General Contractor gets a chance to evaluate costs. And, if you’re lucky, hopefully the design team has considered efficient, cost-effective designs without running amok on scopes of work...
Read More

Be COOL with Realistic Comfort Expectations!

Back in the old days people would dress for the weather, put another log on the fire or head to the beach to deal with extreme weather variations. Today, we adjust a thermostat and expect an immediate response and thermal gratification regardless of the capital, energy cost and GHG emissions required to support our high expectations of comfort.
Read More

Balancing Reality and Good Design

You cannot design a net zero building without a detailed Energy Model to accompany you throughout the design process. Nor can you design a geothermal system without a detailed energy model providing a clear picture of the loads extracted and rejected from the ground. You also need an energy model for the LEED submission process. A casual observer might naturally assume that this energy model is always done by the same person. Unfortunately, this is almost never the case.
Read More

Fun with Contracts

Wow, who would have thought contracts could be so much fun! In setting up the tri-party agreement for the Mosaic Centre, we had to start from an Integrated Project Delivery (IPD) template that was provided by Hanson Bridgett, a legal firm from the U.S. In Canada, we typically use the Royal Architectural Institute of Canadaís (RAIC) standard contract document for an agreement between owner and architect and then facilitate a separate contract between owner and contractor. So when we are asked to use something different, the fun begins.
Read More

Site Update: Freezing Temps and Focus on Foundation

Work is moving along steadily here at the Mosaic Centre. The freezing temperatures over the past few weeks have allowed us to work without fighting the mud and soft soil conditions. This has improved efficiencies as well as the general mood onsite; nobody likes playing in the mud for 10 hours a day. Who would have thought the return of winter would be such a blessing!!
Read More

Beginning with the End in Mind

Wow! I must have done something pretty awesome in a previous life to land this sweet gig. As champion of the working group for the Mosaic Centre, I help represent the thoughts and opinions of the staff from Oil Country Engineering, EcoAmmo and NotBox, the first three tenants of the space. It’s a big job trying to make everyone happy, but I’m more than ready for the challenge.
Read More