skip to Main Content

Reflections on IPD and Site Progress

Having all the mechanical parties heavily involved in the design from the get go means there really isn’t much need for little old me out in the trenches. Sure, I can take a trip out to site, snap some pics for our records, and scrawl up a glowing construction report, but at the end of the day I could just as easily have taken a spin through the 3-D model.
Read More
Back To Top